2026 schedule / Performance / P06
Building Performance & Science — Session 06

The Four Control Layers: Water, Air, Vapor, Thermal

This is the “mental checklist” that prevents most expensive failures: define each control layer, keep it continuous, and line it up across transitions. If you can sketch these four layers, you can debug a lot of buildings.

Suggested runtime: 10–15 min presentation + 30–45 min discussion
Prereq: P05 coupled flows (heat/air/moisture)

Potential agenda

  1. Intro (2 min): “If you can’t draw the layers, you can’t predict the outcome.”
  2. Desired outcome (6–8 min): What “continuous layers” mean in real assemblies
  3. Common failures (6–8 min): Discontinuities, misalignment, and transition failures
  4. Core concepts (6–8 min): Layer hierarchy + where people get tricked
  5. Takeaways (2–3 min): A simple exercise you can use on any building
  6. Discussion (30–45 min): Prompts embedded below

Desired outcome

For any enclosure element (wall, roof, slab edge, window opening), we want:

  • Clear definition of each layer: water control, air control, vapor control, thermal control.
  • Continuity of each layer around the whole building (not just in the “field” of the wall).
  • Alignment so layers support each other instead of creating traps (thermal + air + vapor risk).
  • Buildability: details people can execute consistently.

Discussion prompt

  • Draw test: Can you sketch the 4 layers for a common wall/roof detail you build often?

Common failures

Where four-layer thinking catches problems early Failures often hide at transitions
  • Water layer discontinuity: missing shingle-lap logic at flashings and penetrations.
  • Air layer “Swiss cheese”: lots of small holes that add up (top plates, chases, band joists).
  • Vapor + temperature mismatch: materials placed so the cold surface can’t dry.
  • Thermal bypass: insulation not continuous (rim joists, slab edges, balconies, window bucks).

Examples (worked into failures)

Example — Window opening with great WRB but leaky air barrier

Bulk water stays out, but air leakage drives moisture into the opening; comfort complaints and hidden condensation show up later.

Layer miss: air control discontinuity

Example — Slab edge: “warm floor” isn’t just comfort

Missing thermal control at the slab edge creates cold surfaces, condensation risk, and occupant discomfort—often read as “drafty.”

Layer miss: thermal discontinuity

Discussion prompt

  • Transitions: What transition do you think fails most often in the field (roof-to-wall, window-to-wall, slab edge, deck ledger, etc.)?

Core concepts

1

Not all layers are equal

Bulk water control is highest priority. Air control is often the “silent partner” that makes moisture problems appear.

2

Continuity beats product quality

A mediocre product installed continuously can outperform a premium product installed discontinuously.

3

Layers must “hand off” cleanly

Every transition is a handoff between trades. If the handoff isn’t explicit, it becomes a hole.

4

Vapor control is climate + assembly specific

Don’t memorize rules. Identify the cold surface and the drying direction.

Takeaways

  • Always be able to point to (or draw) the 4 layers in any assembly.
  • Focus energy on transitions; the “field” is usually easy.
  • Use “continuity” as the jobsite test: Where does this layer go next?
  • Next (P07): we zoom into the highest-payoff layer: bulk water control.